Infrastructure
Ethiopian Electric Power Pursuing Two Options to Repair Addis West Substation
TIKVAH Ethiopia · 3 hours ago · Read the Full Story on TIKVAH Ethiopia

AI SUMMARY
Ethiopian Electric Power is utilizing two concurrent repair strategies and rotational power shedding to address a transformer failure at the Addis West Substation that has caused six days of outages across multiple Addis Ababa neighborhoods.
- A sudden transformer failure at the Addis West Substation caused power outages across numerous areas of Addis Ababa for the past six days.
- Affected neighborhoods include Ehil Berenda, Autobus Tera, Kolfe, Bethel, Tor Hailoch, Weyra Sefer, and surrounding vicinities.
- Ethiopian Electric Power and Ethiopian Electric Utility technicians are coordinating repair efforts and providing temporary relief through rotational power shedding.
- The first repair option involves removing the damaged transformer to a workshop, with preparatory disassembly already completed.
- The second concurrent option involves transporting and installing a similar replacement transformer from another location.
- Ethiopian Electric Power Communication Director Moges Mekonnen stated that a definitive timeline for the completion of the complex technical work cannot be provided.
Related
Directive Issued Requiring Government Buildings to Include Gyms and First Aid Stations
The Reporter (Amharic) · 20 hours ago
Ethiopia and Fiza Elixer Sign Strategic Transit and Rail Deal
Ethiopia Today · 23 hours ago
New Directive Mandates Gyms and First Aid Facilities in Government Buildings
The Reporter (Amharic) · 2 days ago
Djibouti, Ethiopia to Break Ground on Landmark $160 million Damerjog Petroleum Terminal
Capital Ethiopia · 4 days ago
